Process Planning And Cost Estimation Set 8

On This Page

This set of Process Planning and Cost Estimation Multiple Choice Questions & Answers (MCQs) focuses on Process Planning And Cost Estimation Set 8

Q1 |                                    is required for preliminary studies of various aspects of a work or project.
Q2 | Approximate cost of a hostel building for 100 students @Rs.10000/- per student works out as Rs. 10 lakhs.
Q3 | Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lakhs.
Q4 | 1 ESTIMATION OF DIFFERENT TYPES OF JOBS
Q5 | Cube rate estimate is less accurate as compared to the plinth area estimate as the height of the building is also compared.
Q6 | For storeyed building plinth area estimate is not prepared for each storey separately.
Q7 |                      is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.
Q8 |                                  is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.
Q9 | In this method approx. total length of walls is found in running metre and this total length multiplied by the rate per running metre of wall gives a fairly accurate cost.
Q10 |                                estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.
Q11 | A large work or project may consists of several building or small works and each of these work is known as                        
Q12 | The term                              is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.
Q13 | Shaping of metal by squeezing them in between two or more dies in order to obtain desire shape is done by?
Q14 | Forging is carried out at which temperature?
Q15 | Which of the following is a type of forging?
Q16 | In which of the following forging metal is kept in the lower die?
Q17 | In which of the forging process metal is kept in between a pair of dies and a gutter is provided in the lower die?
Q18 | In which of the forging process metal is kept in between a pair of dies and no gutter is provided in the lower die?
Q19 | The extra metal which settles down in the gutter is known as?
Q20 | In which of the following forging process no flash is formed?
Q21 | In which of the following forging process poor material utilization occurs?
Q22 | Cogging, which is also called as drawing out, is basically?
Q23 | In rolling operation, the roll rotates with surface velocity?
Q24 | A round billet made of 70-30 brass is extruded at a temperature of 675°C. The billet diameter is 125 mm, and the diameter of the extrusion is 50 mm. Calculate the extrusion force required.
Q25 | In which type of extrusion, a billet is placed in a chamber?