Q1 | A                  view shows the system hardware and how software components are distributed across the processors in the system.
  • physical
  • logical
  • process
  • all of the mentioned
Q2 | The UML was designed for describing
  • object-oriented systems
  • architectural design
  • srs
  • both object-oriented systems and architectural design
Q3 | Which of the following is an architectural conflict?
  • using large-grain components improves performance but reduces maintainability
  • introducing redundant data improves availability but makes security more difficult
  • localizing safety-related features usually means more communication so degraded performance
  • all of the mentioned
Q4 | Which of the following is not included in Architectural design decisions?
  • type of application
  • distribution of the system
  • architectural styles
  • testing the system
Q5 | Architecture once established can be applied to other products as well.
  • true
  • false
Q6 | Which of the following pattern is the basis of interaction management in many web- based systems?
  • architecture
  • repository pattern
  • model-view-controller
  • different operating system
Q7 | What describes how a set of interacting components can share data?
  • model-view-controller
  • architecture pattern
  • repository pattern
  • none of the mentioned
Q8 | Which view in architectural design shows the key abstractions in the system as objects or object classes?
  • physical
  • development
  • logical
  • process
Q9 | Which of the following is a type of Architectural Model?
  • static structural model
  • dynamic process model
  • distribution model
  • all of the mentioned
Q10 | Why is decomposition technique required?
  • software project estimation is a form of problem solving
  • developing a cost and effort estimate for a software project is too complex
  • all of the mentioned
  • none of the mentioned
Q11 | Cost and effort estimation of a software uses only one forms of decomposition, either decomposition of the problem or decomposition of the process.
  • true
  • false
Q12 | If a Direct approach to software project sizing is taken, size can be measured in
  • loc
  • fp
  • loc and fp
  • none of the mentioned
Q13 | Which software project sizing approach develop estimates of the information domain characteristics?
  • function point sizing
  • change sizing
  • standard component sizing
  • fuzzy logic sizing
Q14 | How many forms exists of Barry Boehm’s COCOMO Model?
  • two
  • three
  • four
  • no form exists
Q15 | Who suggested the four different approaches to the sizing problem?
  • putnam
  • myers
  • boehm
  • putnam and myers
Q16 | In many cases, it is often more cost- effective to acquire, rather than develop, computer software.
  • true
  • false
Q17 | A make-buy decision is based on whether
  • the software may be purchased off-the- shelf
  • “full-experience” or “partial-experience” software components should be used
  • customer-built software should be developed
  • all of the mentioned
Q18 | Which of the following is not one of the five information domain characteristics of Function Point (FP) decomposition?
  • external inputs
  • external outputs
  • external process
  • external inquiries
Q19 | The project planner must reconcile the estimates based on decomposition techniques to produce a single estimate of effort.
  • true
  • false
Q20 | Programming language experience is a part of which factor of COCOMO cost drivers?
  • personnel factor
  • product factor
  • platform factor
  • project factor
Q21 | If an Indirect approach is taken, then the sizing approach is represented as
  • loc
  • fp
  • fuzzy logic
  • loc and fp
Q22 | Project management involves the planning, monitoring, and control of the people, process, and events that occur as software evolves from a preliminary concept to an operational implementation.
  • true
  • false
Q23 | 2 COLLECTION OF DATA
  • people
  • product
  • popularity
  • process
Q24 | PM-CMM stands for
  • people management capability maturity model
  • process management capability maturity model
  • product management capability maturity model
  • project management capability maturity model
Q25 | Which of the following is not a project manager’s activity?
  • project control
  • project management
  • project planning
  • project design