This set of Software Testing and Quality Assurance (STQA) Multiple Choice Questions & Answers (MCQs) focuses on Software Testing Quality Assurance Set 15

Q1 | Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
Q2 | Beta testing will be done by
Q3 | Validation plan describes the approach ,resources and schedule used for system validation
Q4 | Integration, It will come under
Q5 | Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
Q6 | Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
Q7 | A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
Q8 | Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
Q9 | Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
Q10 | Quality plan describes the quality procedures and standards that will be used in a project.
Q11 | How severely the bug is effecting the application is called as
Q12 | Project Risk affects The Schedule or Resources.
Q13 | The name of the testing which is done to make sure the existing features are not affected by new changes
Q14 | Management and Measurement, It will come under
Q15 | AdHoc testing is a part of
Q16 | Cost of Production = Right The First time cost(RTF. + Cost of Quality.
Q17 | ------------- means under what test environment(Hardware, software set up. the application will run smoothly
Q18 | TQM represents
Q19 | Optimization, Defect Prevention, and Quality Control. Its come under the
Q20 | Unit Testing will be done by
Q21 | Beta testing will be done at
Q22 | A Plan to overcome the risk called as
Q23 | Which of the following is not included in failure costs?
Q24 | Which requirements are the foundation from which quality is measured?
Q25 | Which of the following is not a SQA plan for a project?