This set of Software Testing and Quality Assurance (STQA) Multiple Choice Questions & Answers (MCQs) focuses on Software Testing Quality Assurance Set 4

Q1 | Test wares are handed over to maintenance team during which phase?
Q2 | What are the criteria to decide the testing efforts?1. Time and budget2. Size of development team3. Size of testers4. Risk associated with project
Q3 | Who leads a formal review process?
Q4 | A chronological record of relevant details about the execution of tests is called as, a _______
Q5 | Non functional testing is performed only at system testing level. True or false.
Q6 | Which of the following is not other name for structural testing?
Q7 | Which things are measured by software Test effectiveness?
Q8 | In which of the following type of testing, testing is done without planning and documentation?
Q9 | When should company stop the testing of a particular software?
Q10 | ___________ refers to a different set of tasks ensures that the software that has been built is traceable to Customer Requirements.
Q11 | Who performs the Acceptance Testing?
Q12 | Before handing over the software to the client, which testing is to be done in-house?
Q13 | Requirement Engineering is not concern with _.
Q14 | When an expected result is not specified in test case template then _.
Q15 | End result of Software Requirement Analysis is _.
Q16 | Bug status is set to postpone due to _.
Q17 | Which Testing is performed first?
Q18 | Verification and Validation uses _.
Q19 | Testing beyond normal operational capacity is _.
Q20 | The expected results of the software is _.
Q21 | Test cases are created in which phase?
Q22 | 7n test cases are generated in which case of Boundary Value Analysis?
Q23 | Which testing cannot be performed on first build of the software?
Q24 | Which testing is performed with Planning and Documentation?
Q25 | GUI means