On This Page

This set of Software Testing and Quality Assurance (STQA) Multiple Choice Questions & Answers (MCQs) focuses on Software Testing Quality Assurance Set 5

Q1 | Plasma panel have resolution.
  • high
  • good
  • a,b
  • none
Q2 | First graphical user interface used commercially was introduced in
  • 1975
  • 1966
  • 1977
  • 1967
Q3 | What is/are the main component / components of user interface ?
  • presentation language
  • action language
  • a,b
  • none
Q4 | Which one is the basic input device in GUI
  • mouse
  • keyboard
  • cpu
  • monitor
Q5 | Which of the following model put much more emphasis on testing?
  • waterfall model
  • agile model
  • spiral model
  • v-v model
Q6 | Independent modules are easier to maintain and test because of.
  • code modification is limited,
  • error propagation is reduced
  • reusable modules are possible.
  • all of the above.
Q7 | Which of the following option is not tracked by configuration management tools?
  • tracking of change proposals
  • storing versions of system components
  • tracking the releases of system versions to customers
  • none of the mentioned
Q8 | Which of the following is not a Software Configuration Management Activity?
  • configuration item identification
  • risk management
  • release management
  • branch management
Q9 | The definition and use of configuration management standards is essential for quality certification in
  • iso 9000
  • cmm
  • cmmi
  • all of the mentioned
Q10 | Client/server architectures cannot be properly tested because network load is highly variable.
  • true
  • false
Q11 | Which of the following is / are types of Software Maintenance?
  • corrective
  • adaptive
  • perfective
  • all of the above
Q12 | _______ is a Software Configuration Management concept that helps us to control change.
  • baseline
  • procedure
  • audit
  • none of the above
Q13 | Software Configuration Management (SCM) is an umbrella activity.
  • true
  • false
Q14 | What is the main aim of Software Configuration Management(SCM)?
  • identifychange
  • controlchange
  • ensure thatchange is
  • all of theabove
Q15 | Select which option is not true about SQA…?
  • audits and reviews to be performed by the team
  • amount of technical work to be performed
  • evaluations to be performed
  • documents that are produced by the sqa team.
Q16 | A product which is manufactured by using the degree of the design specification…
  • quality of conformance
  • quality control
  • quality assurance
  • none of the above.
Q17 | Which of the following is not included in prevention cost?
  • equipment calibration and maintenance
  • formal technical reviews
  • testequipment revie ws
  • quality planning review s
Q18 | Select the people who identify the document and verifies the correctness of the software…
  • project manager
  • sqa team
  • project team
  • all of the mentioned
Q19 | Select the option which is not an appraisal in SQA?
  • inter-process inspection
  • maintenance
  • testing
  • quality planning
Q20 | What does Qa and QC stands for
  • quality assurance and quality control
  • quality adjustment and quality quaity completion
  • quality assurance and queuing control
  • quality adjustment and queuing control
Q21 | Which of the following is not a SQA plan for a project?
  • evaluations to be performed
  • amount of technical work
  • audits and reviews to be performed
  • ocuments to be produced by the sqa group
Q22 | Which of the following is not included in External failure costs?
  • testing
  • help line support
  • warranty work
  • complaint resolution
Q23 | Who identifies, documents, and verifies that corrections have been made to the software?
  • project manager
  • project team
  • sqa group
  • all of the mentioned
Q24 | Quality also can be looked at in terms of user satisfaction which includes
  • a compliant product
  • good quality output
  • delivery within budget and schedule
  • all of the mentioned
Q25 | Which of the following is not a core step of Six Sigma?
  • define
  • control
  • measure
  • analyse