Q1 | For determining the velocity of flow of underground water, the most commonly usednonempirical formula is
Q2 | The most commonly used chemical for de-chlorination of water, is
Q3 | To remove very fine suspended particles from water, the method adopted is
Q4 | Sunlight
Q5 | The detention period for plain sedimentation water tanks, is usually
Q6 | Air valves are generally provided in pressure pipes of water supply
Q7 | The gaseous form of chlorine gets converted into liquid form when subjected to a pressure of
Q8 | Flow through period, in sedimentation tanks, is
Q9 | The maximum hourly consumption, is generally taken as
Q10 | Hardness of water can be removed by boiling if it is due to
Q11 | Hardness of water is caused by
Q12 | The average domestic consumption under normal conditions in an Indian city per day perperson, is
Q13 | If d is the diameter of the pipe, p is the total internal pressure, f is the permissible tensile stressand n is the effective of the joint, the thickness t of metal pipe, is
Q14 | Generally, first portion of a logistic curve for the population growth of a developing city,represents the growth of
Q15 | A pressure conduit carrying water beneath a stream or a canal, is known as
Q16 | Most satisfactory formula for an estimate of fire demand Q for a city of population P inthousands for Indian conditions, is
Q17 | Permanent hardness of water can be removed by
Q18 | The maximum depth of sedimentation tanks is limited to
Q19 | Pick up the incorrect statement from the following. Intake of water supply should
Q20 | The fire demand of a city may be worked out by
Q21 | The formula HL = n²V²L/R4/3 for the head loss in conduits is generally known as
Q22 | The joint used for joining the plain ends of cast iron pipes, is
Q23 | Disinfection of water with ozone is not good because
Q24 | The prescribed hardness limit of potable water ranges between
Q25 | While designing a water supply of an industrial township, industrial and commercial waterdemand of total supply, is assumed