Estimating And Costing Set 4

On This Page

This set of Estimating and Costing Multiple Choice Questions & Answers (MCQs) focuses on Estimating And Costing Set 4

Q1 | The volume is measured correct to the nearest
Q2 | For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
Q3 | Size, capacity and materials need be specified for
Q4 | The expected out turn of half brick partition wall per mason per day is
Q5 | The floor area includes the area of the balcony up to
Q6 | The slope of the outlet of 'P trap' below the horizontal is kept
Q7 | The weight of an item is measured correct to nearest
Q8 | Berms are provided in canals if these are