Estimating And Costing Set 3

On This Page

This set of Estimating and Costing Multiple Choice Questions & Answers (MCQs) focuses on Estimating And Costing Set 3

Q1 | The measurement is made for stone work in square metre in case of
Q2 | Carpet area does not include the area of
Q3 | The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Q4 | The correct Prismoidal formula for volume is
Q5 | In case of laying gullies, siphons, intercepting traps, the cost includes
Q6 | The inspection pit or chamber is a manhole provided in a base drainage system
Q7 | Pick up the incorrect statement from the following:
Q8 | The 'centre line method' is specially adopted for estimating
Q9 | Pick up the incorrect statement from the following:
Q10 | The unit of measurement is per quintal for the following:
Q11 | The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
Q12 | The order of booking dimensions is
Q13 | Pick up the incorrect statement regarding a master trap from the following:
Q14 | S: 1 andlength is
Q15 | The detention period in a septic tank is assumed
Q16 | Pick up the item of work not included in the plinth area estimate
Q17 | The minimum width of a septic tank is taken
Q18 | Pick up the item whose weight is added to the weight of respective item, is
Q19 | The expected out turn for earth work in excavation in ordinary soil per workman per day is
Q20 | The expected out turn of brick work in cement mortar in foundation and plinth per mason per day,is
Q21 | The brick work is measured in sq metre, in case of
Q22 | The height of the sink of wash basin above floor level is kept
Q23 | For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cementrequired, is
Q24 | The item of steel work which is measured in sq.m, is
Q25 | The damp proof course (D.P.C.) is measured in