On This Page

This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on Software Engineering Set 18

Q1 | Hazard avoidance
Q2 | Evolutionary prototyping is
Q3 | Match the following :A- Managed device :B-Managed object:C- Managed processes:1- Type of node residing on a network, such as a computer, printer or routers that contain a management agent.2- Characteristic of a managed device that can be monitored, modified or controlled.3- It is a defined process model. Procedures used are defined and scheduling and relationship between them is defined.
Q4 | Goal is
Q5 | Implementation phase is
Q6 | Evolvability is
Q7 | Match the following A- Functionalrequirements: B- Functional scope : C- Function-point count: D- Function-related measures: 1- It describe the functionality or services that system is expected to provide. 2- Range to which a system component is capable of being applied. 3- These are language independent productive measure.. 4- It is related to the overall functionality of the delivered software.
Q8 | Lehman’s Second Law (Lehman and Belady 1985) is
Q9 | Hazard probability
Q10 | Flexibility
Q11 | Extendibility is
Q12 | Generality is
Q13 | Manufacturing phase is
Q14 | Lehman’s Fourth Law (Lehman and Belady 1985) is
Q15 | Human error is
Q16 | Fault-tolerant architectures is
Q17 | Match the following:A- Formal mathematical transformation:B- Formal process model:C-Formal Specifications:D-Formal System development:1- Here the formal mathema- tical representation of the system takes place.2- It is a starting point for process analysis. It is abstract and only defines the principal process activities and deliverables.3-Specifications expressed in a language whose vocabulary, syntax and semantics are formally defined.4-It is more common to waterfall model, but here the development process is based on formal mathematical transformation of a system specification to an exactable program.
Q18 | Lehman’s First Law (Lehman and Belady 1985) is
Q19 | Graphics
Q20 | Intolerable risk is
Q21 | Hazard
Q22 | Human Computer Interaction is
Q23 | Match the following : A- Maintenance control: B- Maintenance prediction: C- Maintenance process: 1-Cost of planning and scheduling hardware preventive maintenance, and software maintenance and upgrades, managing the hardware and software baselines, and providing response for hardware corrective maintenance. 2- Predicting the number of change requires a system understanding and the relationship between the system and external environment. 3- It is triggered by a set of change requests from system users, management or customers.
Q24 | Installation and checkout phase
Q25 | Software implementation is