Software Testing Quality Assurance Set 15
On This Page
This set of Software Testing and Quality Assurance (STQA) Multiple Choice Questions & Answers (MCQs) focuses on Software Testing Quality Assurance Set 15
Q1 | Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
- true
- false
Q2 | Beta testing will be done by
- developer
- user
- tester
Q3 | Validation plan describes the approach ,resources and schedule used for system validation
- true
- false
Q4 | Integration, It will come under
- cmm level 1
- cmm level 3
- cmm level 2
- none
Q5 | Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
- true
- false
Q6 | Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
- water falls model
- spiral model
- v-model
- linear model
Q7 | A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
- process metric
- product metric
- test metrics
Q8 | Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
- true
- false
Q9 | Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
- false
- true
Q10 | Quality plan describes the quality procedures and standards that will be used in a project.
- false
- true
Q11 | How severely the bug is effecting the application is called as
- severity
- priority
- fix ability
- traceability
Q12 | Project Risk affects The Schedule or Resources.
- true
- false
Q13 | The name of the testing which is done to make sure the existing features are not affected by new changes
- recursive testing
- whitebox testing
- unit testing
- regression testing
Q14 | Management and Measurement, It will come under
- cmm level 1
- cmm level 3
- cmm level 4
- cmm level 2
Q15 | AdHoc testing is a part of
- unit testing
- regression tesing
- exploratory testing
- performance testing
Q16 | Cost of Production = Right The First time cost(RTF. + Cost of Quality.
- true
- false
Q17 | ------------- means under what test environment(Hardware, software set up. the application will run smoothly
- test bed
- checkpoint
- code walk through
- checklist
Q18 | TQM represents
- tool quality management
- test quality manager
- total quality management
- total quality manager
Q19 | Optimization, Defect Prevention, and Quality Control. Its come under the
- cmm level 2
- cmm level 3
- cmm level 4
- cmm level5
Q20 | Unit Testing will be done by
- testers
- end users
- customer
- developers
Q21 | Beta testing will be done at
- user place
- developers place
Q22 | A Plan to overcome the risk called as
- migration plan
- master plan
- maintenance plan
- mitigation plan
Q23 | Which of the following is not included in failure costs?
- rework
- repair
- failure mode analysis
- none of the mentioned
Q24 | Which requirements are the foundation from which quality is measured?
- hardware
- software
- programmers
- none of the mentioned
Q25 | Which of the following is not a SQA plan for a project?
- evaluations to be performed
- amount of technical work
- audits and reviews to be performed
- documents to be produced by the sqa group