On This Page

This set of Software Testing and Quality Assurance (STQA) Multiple Choice Questions & Answers (MCQs) focuses on Software Testing Quality Assurance Set 15

Q1 | Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
  • true
  • false
Q2 | Beta testing will be done by
  • developer
  • user
  • tester
Q3 | Validation plan describes the approach ,resources and schedule used for system validation
  • true
  • false
Q4 | Integration, It will come under
  • cmm level 1
  • cmm level 3
  • cmm level 2
  • none
Q5 | Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
  • true
  • false
Q6 | Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
  • water falls model
  • spiral model
  • v-model
  • linear model
Q7 | A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
  • process metric
  • product metric
  • test metrics
Q8 | Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
  • true
  • false
Q9 | Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
  • false
  • true
Q10 | Quality plan describes the quality procedures and standards that will be used in a project.
  • false
  • true
Q11 | How severely the bug is effecting the application is called as
  • severity
  • priority
  • fix ability
  • traceability
Q12 | Project Risk affects The Schedule or Resources.
  • true
  • false
Q13 | The name of the testing which is done to make sure the existing features are not affected by new changes
  • recursive testing
  • whitebox testing
  • unit testing
  • regression testing
Q14 | Management and Measurement, It will come under
  • cmm level 1
  • cmm level 3
  • cmm level 4
  • cmm level 2
Q15 | AdHoc testing is a part of
  • unit testing
  • regression tesing
  • exploratory testing
  • performance testing
Q16 | Cost of Production = Right The First time cost(RTF. + Cost of Quality.
  • true
  • false
Q17 | ------------- means under what test environment(Hardware, software set up. the application will run smoothly
  • test bed
  • checkpoint
  • code walk through
  • checklist
Q18 | TQM represents
  • tool quality management
  • test quality manager
  • total quality management
  • total quality manager
Q19 | Optimization, Defect Prevention, and Quality Control. Its come under the
  • cmm level 2
  • cmm level 3
  • cmm level 4
  • cmm level5
Q20 | Unit Testing will be done by
  • testers
  • end users
  • customer
  • developers
Q21 | Beta testing will be done at
  • user place
  • developers place
Q22 | A Plan to overcome the risk called as
  • migration plan
  • master plan
  • maintenance plan
  • mitigation plan
Q23 | Which of the following is not included in failure costs?
  • rework
  • repair
  • failure mode analysis
  • none of the mentioned
Q24 | Which requirements are the foundation from which quality is measured?
  • hardware
  • software
  • programmers
  • none of the mentioned
Q25 | Which of the following is not a SQA plan for a project?
  • evaluations to be performed
  • amount of technical work
  • audits and reviews to be performed
  • documents to be produced by the sqa group