On This Page

This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on Software Engineering Set 13

Q1 | Unit testing process is
  • Software designing process
  • Software operating process
  • Software validation process
  • Software decomposition process
Q2 | CASE environment supports
  • Individual process tasks
  • Individual process phases
  • Most process tasks and process phases
  • None of these
Q3 | CASE work benches support
  • Individual process tasks
  • Process phases and activities
  • Development software
  • Operation software
Q4 | Error location and repair is
  • System modeling process
  • System design process
  • System verification process
  • System decomposition process
Q5 | Quality plan describes
  • Quality procedure and standards
  • Approaches, resources and schedules
  • Configuration management and structure
  • None of these
Q6 | Which one is not true for risk analysis ?
  • It estimate risks
  • It removes risks
  • It reduces risks
  • It develops risks
Q7 | Project schedule can be illustrated in
  • Bar-charts
  • Activity-networks
  • Figures
  • None of these
Q8 | Change in technology is a
  • Technology risk
  • People risk
  • Tool risk
  • Implementation risk
Q9 | Under estimate of cost is
  • Technology risk
  • People risk
  • Estimation risk
  • Organizational risk
Q10 | Maintenance plan describes
  • Quality procedure
  • Schedule procedure
  • Maintenance procedure
  • Configuration procedure
Q11 | Failure of schedule is
  • People risk
  • Organizational risk
  • Estimation risk
  • Requirement risk
Q12 | Risk planning involves
  • Avoidance strategies
  • Minimization strategies
  • Contingency plan
  • All the above
Q13 | Which is not the part of scheduling process?
  • Creating project chart
  • Defining roles/activities
  • Estimating failures
  • Selling product
Q14 | Use of Email instead of post & telegraph is due to
  • Technology changes
  • Requirement changes
  • Users access
  • All the above
Q15 | Using P-IV instead of P-I is due to
  • Requirement change
  • Faster access
  • Technology improvement
  • All the above
Q16 | The term user requirements
  • Are statements, made in natural language and diagrams of services that system is expected to provide and the constrains on the system
  • The system services and details, can serve as contract between buyer and software developers
  • An abstract description of software design
  • None of these
Q17 | Software design specification
  • Are statements, made in natural language to specify the system specification and constraints
  • An abstract description of software design, which is an extension of system requirement specification
  • Discusses the market policy of the system
  • None of these
Q18 | Software consists of
  • Computer program only
  • Computer program and associated documentations
  • Documentation only
  • Hardware
Q19 | Software engineering deals with
  • Software development
  • Hardware development
  • System development
  • Network development
Q20 | System engineering deals with
  • Software development only
  • Hardware development only
  • Software and Hardware development
  • Network development
Q21 | Work flow model includes
  • Inputs
  • Out puts
  • Dependencies
  • All the above
Q22 | Rules are
  • Constraints define for system models
  • Input data
  • Out put data
  • Activities in involved in the system
Q23 | Hardware represents
  • Documentations
  • Programs
  • Computer systems
  • Rules
Q24 | The system failure due to power failure is considered under
  • Hardware reliability
  • Software reliability
  • Operation reliability
  • None of these
Q25 | Components such as wheel, chain, handle etc are assembled to produce bicycle. The use of bicycle as transportation device is considered to be
  • Functional property
  • Non-functional property
  • Software system
  • None of these