This set of Total Quality Management TQM Multiple Choice Questions & Answers (MCQs) focuses on Total Quality Management Set 8

Q1 | ______________ diagram is used for identifying potential relationship between twovariables.
  • Pareto
  • Ishikawa
  • Histogram
  • Scatter
Q2 | Lots for acceptance sampling should be ______________ and ______________.
  • Homogeneous, Large
  • Heterogeneous, Small
  • Homogeneous, Small
  • Heterogeneous, Large
Q3 | The roof of house of quality shows the interrelationship between:
  • Functional Requirements
  • Design Attributes
  • Service Process
  • Manufacturing Process
Q4 | X bar charts are uses to control the ______________ of a process.
  • Dispersion
  • Central tendency
  • None of the above
  • Both a and b
Q5 | Given that for the three samples, the value of R bar is .66 and value of d2 corresponding tothree is1.128, what is the estimated standard deviation?
  • .43
  • .67
  • .58
  • .75
Q6 | Given L=3 and p=.03, estimate the sample size that can be used for construction of a pchart.
  • 534
  • 321
  • 123
  • 291 ((1-p)∗L2/p gives us an estimate of sample size)
Q7 | The chart used for tracking number non-conforming is:
  • P
  • Np
  • X bar
  • None of the above
Q8 | For a c chart, the OC curve plots the ______________ against ______________.
  • Probability of Type 2 error, true mean number of defects
  • Probability of Type 1 error, true mean number of defects
  • Probability of Type 1 error, true total number of defects
  • Probability of Type 2 error, true total number of defects
Q9 | Identification of customers and listening to the Voice of Customer (VoC) are a part of:
  • Quality Assurance
  • Quality Planning
  • Quality Control and Improvement
  • Quality Execution
Q10 | Ease of repair is associated with ______________ dimension of quality.
  • Serviceability
  • Performance
  • Durability
  • Perceived Quality
Q11 | SIPOC diagram, used for understanding the flow in a process is used in ______________stage of DMAIC.
  • Define
  • Measure
  • Analyze
  • Improve
Q12 | Two major components of fitness of use are Quality of Design and ______________.
  • Quality of Conformance
  • Quality of Service
  • Quality of Specification
  • none
Q13 | For new product development, the chosen methodology should be
  • DMADV
  • DMAIC
  • Structured Design Methodology
  • DMIE
Q14 | In DMAIC, redesigning of process to either remove bottlenecks or to reduce waste takesplace in the ______________ stage.
  • Define
  • Measure
  • Improve
  • Control
Q15 | The critical path method determines the ______________ path from the beginning to theend of the project.
  • Shortest
  • Quickest
  • Longest
  • Middle
Q16 | The Operating characteristic curve shows the relationship between the probability ofacceptance (on y axis) and ______________ (on x axis).
  • Proportion defective
  • Proportion acceptable
  • Number of lots
  • Size of lot
Q17 | In a double sampling plan, let d1 be the number of defects in the first sample and d2 be thenumber of defects in the second sample. Let c2 be the acceptance number for both samples. The condition for rejection is:
  • D1+d2
  • D1+d2>c2
  • D1∗d2>c2
  • D1∗d2
Q18 | While random variability in a system can be removed by ______________, non-randomvariability requires ______________.
  • Operator or management action, Improvement in the system
  • Improvement in the system, operator or management action
  • Statistical Quality Control, Quality Checks
  • None of the above
Q19 | The concept of rational sub group means that subgroups or samples be selected such that ifassignable causes are present the chances for differences between subgroups will be ______________.
  • minimized
  • maximized
  • neutralized
  • optimized
Q20 | Q-Q plot is used to check:/p>
  • Normality of the dataset
  • Number of defects
  • Process mean
  • Process standard deviation
Q21 | The OC curve provides a measure of the ______________ of the control chart.
  • Sensitivity
  • Duality
  • none
  • none
Q22 | Which of the following is not a type of attribute chart?
  • P chart
  • C chart
  • U char
  • X bar chart
Q23 | The thickness of aluminum sheet is specified to be of 6±2 mm. The Upper SpecificationLimit and Lower Specification Limit for the sheet are:
  • 4mm, 8mm
  • 8mm, 4mm
  • 6mm, 8mm
  • 4mm, 6mm
Q24 | Failure Mode and Effects Analysis, which prioritizes different sources of error, is used in______________ stage.
  • Define
  • Measure
  • Improve
  • Analyze
Q25 | In a six sigma improvement project the least experienced individuals are:
  • Green Belt
  • Black belts
  • Red Belts
  • Master Black Belts