Estimating And Costing Set 4

On This Page

This set of Estimating and Costing Multiple Choice Questions & Answers (MCQs) focuses on Estimating And Costing Set 4

Q1 | The volume is measured correct to the nearest
  • 0.01 cum
  • 0.02 cum
  • 0.03 cum
  • 0.04 cum
Q2 | For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
  • 0.90 m3
  • 0.94 m3
  • 0.98 m3
  • 1.00 m3
Q3 | Size, capacity and materials need be specified for
  • bib-cocks
  • stop-cocks
  • ball valves
  • all the above
Q4 | The expected out turn of half brick partition wall per mason per day is
  • 1.5 m3
  • 2.0 m3
  • 4.0 m2
  • 5.0 m2
Q5 | The floor area includes the area of the balcony up to
  • 100 %
  • 75 %
  • 50 %
  • 25 %
Q6 | The slope of the outlet of 'P trap' below the horizontal is kept
  • 10°
  • 12°
  • 14°
Q7 | The weight of an item is measured correct to nearest
  • 0.25 kg
  • 0.50 kg
  • 0.75 kg
  • 1.00 kg
Q8 | Berms are provided in canals if these are
  • fully in excavation
  • partly in excavation and partly in embankment
  • fully in embankment
  • all the above