On This Page
This set of Estimating and Costing Multiple Choice Questions & Answers (MCQs) focuses on Estimating And Costing Set 4
Q1 | The volume is measured correct to the nearest
- 0.01 cum
- 0.02 cum
- 0.03 cum
- 0.04 cum
Q2 | For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
- 0.90 m3
- 0.94 m3
- 0.98 m3
- 1.00 m3
Q3 | Size, capacity and materials need be specified for
- bib-cocks
- stop-cocks
- ball valves
- all the above
Q4 | The expected out turn of half brick partition wall per mason per day is
- 1.5 m3
- 2.0 m3
- 4.0 m2
- 5.0 m2
Q5 | The floor area includes the area of the balcony up to
- 100 %
- 75 %
- 50 %
- 25 %
Q6 | The slope of the outlet of 'P trap' below the horizontal is kept
- 8°
- 10°
- 12°
- 14°
Q7 | The weight of an item is measured correct to nearest
- 0.25 kg
- 0.50 kg
- 0.75 kg
- 1.00 kg
Q8 | Berms are provided in canals if these are
- fully in excavation
- partly in excavation and partly in embankment
- fully in embankment
- all the above