Estimating And Costing Set 3

On This Page

This set of Estimating and Costing Multiple Choice Questions & Answers (MCQs) focuses on Estimating And Costing Set 3

Q1 | The measurement is made for stone work in square metre in case of
  • wall facing
  • columns, lintels, copings
  • building work
  • (a) and (d) of the above
Q2 | Carpet area does not include the area of
  • the walls along with doors and other openings
  • bath room and lavatory
  • kitchen and pantry
  • all the above
Q3 | The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
  • ½ ( + ) h
  • ( + ) h + sb²
  • ( + ) + 2sh²
  • 2 [( + ) (b + sh²)]
Q4 | The correct Prismoidal formula for volume is
  • d [first area + last area + even area + 2 odd areas]
  • d/3 [first area + last area + 4 even area + 2 odd areas]
  • d/3 [first area + last area + 2 even area + 4 odd areas]
  • d/6 [first area + odd areas]
Q5 | In case of laying gullies, siphons, intercepting traps, the cost includes
  • setting and laying
  • bed concreting
  • connection to drains
  • all of these
Q6 | The inspection pit or chamber is a manhole provided in a base drainage system
  • at every change of direction
  • at every change of gradient
  • at every 30 m intervals
  • all the above
Q7 | Pick up the incorrect statement from the following:
  • dimensions are measured to the nearest 0.01 m
  • areas are measured to the nearest 0.01 sq.m
  • cubic contents are measured to the nearest 0.1 cum
  • weights are measured to the nearest 0.001 tonnes
Q8 | The 'centre line method' is specially adopted for estimating
  • circular buildings
  • hexagonal buildings
  • octagonal buildings
  • all the above
Q9 | Pick up the incorrect statement from the following:
  • the built up covered area at the floor level of any storey of a building is called plinth area
  • the usable covered area of the rooms of any storey of a building is called carpet area
  • the carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area
  • none of these
Q10 | The unit of measurement is per quintal for the following:
  • collapsible gates with rails
  • rolling shutters
  • expanded metal wire netting
  • m.s. reinforcement of r.c.c. works
Q11 | The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
  • 100 mm
  • 150 mm
  • 200 mm
  • 175 mm
Q12 | The order of booking dimensions is
  • length, breadth, height
  • breadth, length, height
  • height, breadth, length
  • none of these
Q13 | Pick up the incorrect statement regarding a master trap from the following:
  • it is provided in between the lower end of the house drain and the street sewer
  • it is provided a cleaning eye at the top of the trap
  • the mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
  • the water seal is less than that of ordinary traps
Q14 | S: 1 andlength is
  • d × d × s
  • d2× (ds)2]
  • l.d 1 + s2)
  • 2 l.d 1 + s2)
Q15 | The detention period in a septic tank is assumed
  • 20 minutes
  • 25 minutes
  • 30 minutes
  • 40 minutes
Q16 | Pick up the item of work not included in the plinth area estimate
  • wall thickness
  • room area
  • w.c. area
  • courtyard area
Q17 | The minimum width of a septic tank is taken
  • 70 cm
  • 75 cm
  • 80 cm
  • 90 cm
Q18 | Pick up the item whose weight is added to the weight of respective item, is
  • cleats
  • brackets
  • bolts
  • all the above
Q19 | The expected out turn for earth work in excavation in ordinary soil per workman per day is
  • 1.00 cum
  • 2.00 cum
  • 3.00 cum
  • 4.00 cum
Q20 | The expected out turn of brick work in cement mortar in foundation and plinth per mason per day,is
  • 1.00 m3
  • 1.25 m3
  • 1.50 m3
  • 1.75 m3
Q21 | The brick work is measured in sq metre, in case of
  • honey comb brick work
  • brick flat soling
  • half brick walls or the partition
  • all the above
Q22 | The height of the sink of wash basin above floor level is kept
  • 60 cm
  • 70 cm
  • 75 cm to 80 cm
  • 80 cm
Q23 | For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cementrequired, is
  • 0.200 m3
  • 0.247 m3
  • 0.274 m3
  • 0.295 m3
Q24 | The item of steel work which is measured in sq.m, is
  • collapsible gates
  • rolling shutters
  • ventilators and glazing
  • all the above
Q25 | The damp proof course (D.P.C.) is measured in
  • cub. m
  • sq. m
  • metres
  • none of these