Software Testing Quality Assurance Set 5
On This Page
This set of Software Testing and Quality Assurance (STQA) Multiple Choice Questions & Answers (MCQs) focuses on Software Testing Quality Assurance Set 5
Q1 | Plasma panel have resolution.
- high
- good
- a,b
- none
Q2 | First graphical user interface used commercially was introduced in
- 1975
- 1966
- 1977
- 1967
Q3 | What is/are the main component / components of user interface ?
- presentation language
- action language
- a,b
- none
Q4 | Which one is the basic input device in GUI
- mouse
- keyboard
- cpu
- monitor
Q5 | Which of the following model put much more emphasis on testing?
- waterfall model
- agile model
- spiral model
- v-v model
Q6 | Independent modules are easier to maintain and test because of.
- code modification is limited,
- error propagation is reduced
- reusable modules are possible.
- all of the above.
Q7 | Which of the following option is not tracked by configuration management tools?
- tracking of change proposals
- storing versions of system components
- tracking the releases of system versions to customers
- none of the mentioned
Q8 | Which of the following is not a Software Configuration Management Activity?
- configuration item identification
- risk management
- release management
- branch management
Q9 | The definition and use of configuration management standards is essential for quality certification in
- iso 9000
- cmm
- cmmi
- all of the mentioned
Q10 | Client/server architectures cannot be properly tested because network load is highly variable.
- true
- false
Q11 | Which of the following is / are types of Software Maintenance?
- corrective
- adaptive
- perfective
- all of the above
Q12 | _______ is a Software Configuration Management concept that helps us to control change.
- baseline
- procedure
- audit
- none of the above
Q13 | Software Configuration Management (SCM) is an umbrella activity.
- true
- false
Q14 | What is the main aim of Software Configuration Management(SCM)?
- identifychange
- controlchange
- ensure thatchange is
- all of theabove
Q15 | Select which option is not true about SQA…?
- audits and reviews to be performed by the team
- amount of technical work to be performed
- evaluations to be performed
- documents that are produced by the sqa team.
Q16 | A product which is manufactured by using the degree of the design specification…
- quality of conformance
- quality control
- quality assurance
- none of the above.
Q17 | Which of the following is not included in prevention cost?
- equipment calibration and maintenance
- formal technical reviews
- testequipment revie ws
- quality planning review s
Q18 | Select the people who identify the document and verifies the correctness of the software…
- project manager
- sqa team
- project team
- all of the mentioned
Q19 | Select the option which is not an appraisal in SQA?
- inter-process inspection
- maintenance
- testing
- quality planning
Q20 | What does Qa and QC stands for
- quality assurance and quality control
- quality adjustment and quality quaity completion
- quality assurance and queuing control
- quality adjustment and queuing control
Q21 | Which of the following is not a SQA plan for a project?
- evaluations to be performed
- amount of technical work
- audits and reviews to be performed
- ocuments to be produced by the sqa group
Q22 | Which of the following is not included in External failure costs?
- testing
- help line support
- warranty work
- complaint resolution
Q23 | Who identifies, documents, and verifies that corrections have been made to the software?
- project manager
- project team
- sqa group
- all of the mentioned
Q24 | Quality also can be looked at in terms of user satisfaction which includes
- a compliant product
- good quality output
- delivery within budget and schedule
- all of the mentioned
Q25 | Which of the following is not a core step of Six Sigma?
- define
- control
- measure
- analyse