Q1 | Zero duration activities but are assumed to start at the same time as thefirst and the end at the same time as the last one is called__________ activity.
- hijacked.
- heuristic.
- hammocked.
- hole.
Q2 | ……………..is called if subsequent have the time by which an activity may bedelayed without affecting.
- action float.
- terminal float.
- free float
- null float
Q3 | _________ activities on the network diagram have zero duration and useno resources.
- dangling.
- dummy.
- null.
- zero.
Q4 | ____________is part of Risk Management.
- risk analysis and risk estimation.
- risk control and risk planning.
- risk identification and monitoring.
- risk control, planning, identification and monitoring.
Q5 | The activities have zero duration but are assumed to start at the sametime as the first and the end at the same time as the last one iscalled__________ activity.
- hijacked.
- heuristic.
- hammocked.
- hole.
Q6 | ____ is carried out to calculate the earliest dates on which each activitymay be started and completed.
- backward pass.
- forward pass.
- no pass.
- increasing pass.
Q7 | In Software Prototype, ___________ means copies of input screens areshown to the users on a workstation, but the screens cannot actually be used.
- simulation.
- annealing.
- mock-ups.
- rad system.
Q8 | . In software prototype, partial working model is classified into ________.
- vertical and horizontal.
- vertical and straight.
- bended and horizontal.
- elevated and horizontal.
Q9 | . The scope of the deliverables for an increment is rigidly constrained by anagreed deadline called as ____________.
- sand boxing.
- time boxing.
- time delaying.
- local delaying.
Q10 | . SSADM means ___________.
- straight systems analysis design method.
- structured systems analysis design method.
- software systems analysis design method.
- solutions systems analysis design method.
Q11 | Sometimes redesigns of the code is often called as ________.
- refactoring.
- redesigning.
- recoding.
- rearranging.
Q12 | Find the two levels of development suggested by Booch ?
- micro and macro processes.
- inter and intra processes.
- internal and external processes.
- small and large processes.
Q13 | ________ is refined by Barry Boehm and his co-workers.
- cocomo iii.
- cocomo iv.
- cocomo ii.
- cocomo i.
Q14 | CPM can be expanded as _______.
- control path method.
- critical path method.
- cohesion path method.
- control path model.
Q15 | he Cost Benefit Analysis is done for ___________ feasibility.
- social
- technical.
- programm
- economical.
Q16 | One can_______ is classified into Functional and Non-functional.
- project.
- requirements.
- start date. .
- risk
Q17 | Security (backups, firewall) will be a ________ requirement.
- functional.
- non-functional.
- normal.
- security.
Q18 | Time behaviour is the sub-characteristics of _______.
- maintainability.
- efficiency.
- usability.
- reliability.
Q19 | ________ a set of attributes (data items) and that will be manipulatedwithin the software (system).
- instance.
- class.
- object.
- data.
Q20 | _________ indicates the connectedness of the system that can be derivedmechanically.
- dependency.
- re-occurrence.
- inheritance
- relationship.
Q21 | Diagrammatic form for Flow oriented Modelling………
- functional diagrams.
- er diagrams.
- data flow diagrams.
- system flow diagrams.
Q22 | The sub-characteristics of efficiency is …..
- understandability.
- learnability.
- resource utilization.
- accuracy.