Q1 | Zero duration activities but are assumed to start at the same time as thefirst and the end at the same time as the last one is called__________ activity.
  • hijacked.
  • heuristic.
  • hammocked.
  • hole.
Q2 | ……………..is called if subsequent have the time by which an activity may bedelayed without affecting.
  • action float.
  • terminal float.
  • free float
  • null float
Q3 | _________ activities on the network diagram have zero duration and useno resources.
  • dangling.
  • dummy.
  • null.
  • zero.
Q4 | ____________is part of Risk Management.
  • risk analysis and risk estimation.
  • risk control and risk planning.
  • risk identification and monitoring.
  • risk control, planning, identification and monitoring.
Q5 | The activities have zero duration but are assumed to start at the sametime as the first and the end at the same time as the last one iscalled__________ activity.
  • hijacked.
  • heuristic.
  • hammocked.
  • hole.
Q6 | ____ is carried out to calculate the earliest dates on which each activitymay be started and completed.
  • backward pass.
  • forward pass.
  • no pass.
  • increasing pass.
Q7 | In Software Prototype, ___________ means copies of input screens areshown to the users on a workstation, but the screens cannot actually be used.
  • simulation.
  • annealing.
  • mock-ups.
  • rad system.
Q8 | . In software prototype, partial working model is classified into ________.
  • vertical and horizontal.
  • vertical and straight.
  • bended and horizontal.
  • elevated and horizontal.
Q9 | . The scope of the deliverables for an increment is rigidly constrained by anagreed deadline called as ____________.
  • sand boxing.
  • time boxing.
  • time delaying.
  • local delaying.
Q10 | . SSADM means ___________.
  • straight systems analysis design method.
  • structured systems analysis design method.
  • software systems analysis design method.
  • solutions systems analysis design method.
Q11 | Sometimes redesigns of the code is often called as ________.
  • refactoring.
  • redesigning.
  • recoding.
  • rearranging.
Q12 | Find the two levels of development suggested by Booch ?
  • micro and macro processes.
  • inter and intra processes.
  • internal and external processes.
  • small and large processes.
Q13 | ________ is refined by Barry Boehm and his co-workers.
  • cocomo iii.
  • cocomo iv.
  • cocomo ii.
  • cocomo i.
Q14 | CPM can be expanded as _______.
  • control path method.
  • critical path method.
  • cohesion path method.
  • control path model.
Q15 | he Cost Benefit Analysis is done for ___________ feasibility.
  • social
  • technical.
  • programm
  • economical.
Q16 | One can_______ is classified into Functional and Non-functional.
  • project.
  • requirements.
  • start date. .
  • risk
Q17 | Security (backups, firewall) will be a ________ requirement.
  • functional.
  • non-functional.
  • normal.
  • security.
Q18 | Time behaviour is the sub-characteristics of _______.
  • maintainability.
  • efficiency.
  • usability.
  • reliability.
Q19 | ________ a set of attributes (data items) and that will be manipulatedwithin the software (system).
  • instance.
  • class.
  • object.
  • data.
Q20 | _________ indicates the connectedness of the system that can be derivedmechanically.
  • dependency.
  • re-occurrence.
  • inheritance
  • relationship.
Q21 | Diagrammatic form for Flow oriented Modelling………
  • functional diagrams.
  • er diagrams.
  • data flow diagrams.
  • system flow diagrams.
Q22 | The sub-characteristics of efficiency is …..
  • understandability.
  • learnability.
  • resource utilization.
  • accuracy.