Work Management means
the right components, the right time, the right components, and safely
Work Management process
makes sure it is safe for me to work on a component or equipment.
Work Management parts
makes sure I have the parts needed when I do the work
Work Management ensures
that when I identify something is broken it will be addressed.
Description of work management process
Identify, Screen, Plan, Schedule, Execute and Complete
Work Screening and Processing
first step of WM process
Work Screening and Processing descript
relies on your involvement, identifies safety concerns, requires a SRO to be involved, determined priority, assigns to approp group, determines the level of maintenance required
Screening results
work gets assigned to the right department
Screening results
work has been determined to be online or outage work
Screening results
priorities are assign to each Task A-C for passport (A highest) or 1 to 5 for PIMS (1 is highest)
Maintenance Planning
determines the details, develop work instructions, clearance orders are identified, parts identification and ordering, identify resources, define and plan support from other groups.
Cycle Plan
online work, based on a rolling 13 week interval over the course of a fuel cycle
System Availability
planning can bundle several work task together for when a system is out of service
E-20 establishes
risk managmenet reviews called PRA and insures we operate the plant safely, schedule development milestones or what has to happen when
E-0
week work is executed in
Right work validation
E-20, cycle manager and system engineers determine scope, work is selected based on the equipment reliability process, work is bundled with other preventive maintenance activities, work scope is developed based on available maintenance resources
E-15
scope freeze, work package planning begins, parts should be identified, resources required match resources available, any exceptions will have owners assigned
E15 thru E8
Coordinate any rescheduling, complete planning work packages by the end of E-10, prepare to freeze the schedule.
E10
Packages planned
E6
verify the job is ready for work, assign to appropriate work week manager
E6 the E2
task is assigned to specific crew, risk assessment reviews continue, operational conflicts are eliminated, RP coordinate enhanced planning if needed.
E3
schedule freeze, another risk assessment review, distribute frozen schedule to the work groups, departments now own schedule.
E1
preparation week, align or swap equipment, finalize briefings, equipment, staging
E+1
performance review week, review of performance indicators, identify any improvement opportunities or lessons learned
Passport and Pims
central database for planning, scheduling, and the completion of work orders
Passport and pims provide equipment info such as
location desired configuration and adjustable parameters