To eliminate the need to tap a hole before installing a screw, use a _____.

. thread-forming screw

Ducting, plumbing, and wiring can easily be run through the open webs of a(n) _____.

truss

Furring of masonry walls is generally done on _____.

16" centers

The saw that is suitable for heavy-duty wood cutting is the _____.

reciprocating saw

Reciprocating saw blades with 10 to 18 teeth per inch are generally used to saw _____.

metal

In roof framing, the term applied to the horizontal distance from the outside of the top plate to the center of the ridgeboard is _____.

run

When selecting hand protection, all of the following are important work activities to consider except:

The cost of the hand protection

Employees should be involved in selecting any PPE.

True

When selecting the length for a wood screw, choose a screw so that the portion of the screw that will enter the piece of wood is _____.

two-thirds of its length

Short pieces of 2 � 4 blocking nailed between studs are required in some areas to

slow the spread of fire

The web of a wood I-beam is made of plywood or _____.

OSB

A cripple stud is one that _____.

fills the space between a header and a top plate

A box beam is a type of _____.

header assembly

The fastening device that saves time on wire and cable bundling because it is quickly installed and is self-locking is a _____.

tie wrap

The roof design that provides more space in the upper level of the building when compared with the gable roof is the _____.

mansard roof

To be sure electrical equipment actually performs as designed, it must be inspected for damage ___________.

Before each day's use and following any incident causing damage

The fasteners typically used to fasten boxes, panels, and enclosures to wood when more holding power is needed than can be provided by nails are _____.

wood screws

The maximum depth of end notches in wood joists in relation to the depth of the joist is _____.
Select one:

. one-fourth

A king stud in a rough opening runs from the _____.

soleplate to the top plate

Toggle bolts are used to fasten equipment or a part to _____.

hollow walls or ceilings

When two or more joists are needed to cover the span, support for the inboard joist ends must be provided by one or more beams commonly called _____.

girders

Engineering controls to eliminate or reduce noise exposure include all of the following except:

. Revise work procedures

The fasteners that can be used on hollow walls are _____.

metal drive-in anchors

Which of the following statements about drilling and notching lumber floor joists is true?

Holes must be at least 2" from the top or bottom edge of the joist.